Sales: 01428 606616  |  Service: 01428 606606

01428 606616

Hindhead tunnel-open

  • Hindhead tunnel-open

Now with the opening of the Hindhead tunnel we have dual carriageway nearly to our front door!The 1.1 mile tunnel is now open in both direction-sounds fantastic!
New directions are-

Heading South go through the tunnel ensuring you are in the left hand as you approach the tunnel exit-the first count marker is inside the tunnel.Up the slip road to the roundabout and take the third exit off the roundabout across- the A3 to the next roundabout and take the second exit up what was the old A3 and is now the A333, take the next road left which is Headley road.The Total petrol station is on the junction.We are 1/2 mile down on the left hand side.BASICALLY FOLLOW THE BROWN AND WHITE TOURIST SIGNS TO GRAYSHOTT POTTERY FROM THE A3.

Heading NORTH.
Exit the A3 at the Grayshott exit, the last BEFORE the tunnel and take the second exit off the round about up what was the old A3 and is now the A333, take the next road left which is Headley road.The Total petrol station is on the junction.We are 1/2 mile down on the left hand side.BASICALLY FOLLOW THE BROWN AND WHITE TOURIST SIGNS TO GRAYSHOTT POTTERY FROM THE A3.